skip to main | skip to sidebar

DIGIGRIPPER

Friday, October 19, 2007

Modding the hinges




The normal hinges from the hard ware shop were modified. We place an additional hole very close to the axis and cut them to length.
Posted by olafval at 1:00 AM

0 comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

Persons

  • Olaf Val
  • Catrine Val
  • Thomas Wappler
  • Paul Ertel

Blog Archive

  • ►  2009 (2)
    • ►  June (1)
      • Joel Baumann and Björn Melhus examine the DIGIGRIP...
    • ►  April (1)
      • DIGIGRIPPER at Berlin
  • ►  2008 (7)
    • ►  October (2)
      • Walking Around
      • In Context
    • ►  September (3)
      • Installing at [plug.in], Basel
      • www.culturalwork.com
      • Preparation for next exhibition
    • ►  March (2)
      • DIGIGRIPPER NEWS
      • Documentation
  • ▼  2007 (21)
    • ►  November (4)
      • Palma de Mallorca Set Up
      • The archetype
      • It`s shipped to day
    • ▼  October (11)
      • Blinking
      • Multiply work by 35
      • Modding the hinges
      • LED mounting
      • Sand blasting
      • Coding the Arduino
      • Locksmith's shop
      • Circuit Diagram
      • PCB Lay Out
      • Wood workshop
      • LED and Acryl Test
    • ►  September (6)
      • The Terminal Program is ready
      • Test Test Test
      • Digigripper, the concept:
      • We are Information
      • First magnet test
      • First Damper Test